
Last week the rainwater storage tank was set in place. I think we did ok and didn't have to disturb too many large roots for the tree at the front of the house. I'd like to preserve that if at all possible. This tank will collect the water from the roof (1" of rainfall will fill the tank) for use in flushing toilets and irrigation/outside water usage.

Chris of Kala Construction is working hard framing the roof over the garage. John Enzor is busy marking for cuts in the background. Cold day - waiting for the snowstorm.

It's a little easier to see the outline of the house now.

This is a view from the front through to the back.
