Thursday, August 7, 2008

Wow - this is really exciting!

It's been a few weeks since I've posted an update. A lot's been happening despite the near 100 degree temperatures in Raleigh. Two of the houses are now framed inside & out.

Chris Kala (at left) is now back from vacation and so more progress will be made soon, I'm sure! Hi Chris!




The first house (916 Oakwood) has finished rough-in plumbing, electrical and HVAC. The windows are almost all in, the siding is going on and the roof should be on next week. Then we start painting.

Hopefully next week we'll get insulation in and maybe even start sheetrock!



This is what the inside looks like now - looking from the front doorway through the livingroom. The skylight still needs to go in the LR - that will brighten it up a lot. The exposed-brick fireplace stays - but will be opened up and sealed - used for gas logs. You can see the kitchen area behind the stairs, then the first floor BR beyond that (with it's own bath).

Upstairs is an open loft with a vaulted ceiling and skylight then the Master BR with it's own bath, a window seat, and a french door out to a private balcony which overlooks the City skyline. Very cool view!


Siding going on the outside of 916!